Out now on iOS, Android and web

Plan the work. Do it in the field. Prove it happened.

Auxein Grow runs the vineyard day to day - tasks row by row, observations spot by spot, hazards, hours and stock - on forty years of property-level climate data and peer-reviewed disease models. Your audit pack writes itself as you work.

Get the field app

Download on the App StoreGet it on Google Play
How it works

One loop, four moves

Most vineyard software asks you to do the job, then record the job. Grow records it because you did it - the compliance trail is a by-product, not a second shift.

Plan

Schedule the work

Build a task from a template, drop it on blocks or land-management areas, attach the equipment and the consumables, and assign the crew. Roll-ups group the same job across a whole property.

Do

Work in the field

The crew works the task on their phone, row by row, raising issues as they find them. Observations are captured spot by spot with GPS, photos and the row they came from.

Prove

Keep the record

Every spray, observation, incident, visitor and hour is timestamped against its block and property as a by-product of doing the job. Nothing is written twice.

Learn

See what it cost

Hours per hectare, cost per hectare, disease pressure against your own conditions, and forty years of climate behind every property you farm.

The product

What you get on day one

Everything below is shipped and in use. Nothing on this page is a roadmap item.

Tasks

A job of work, down to the row

Tasks carry a category, a schedule, a location, assignees, equipment and consumables. Blocks with rows can be worked row by row - each row keeps its own status, notes, issues found and quality rating. Completing a task is what writes the hours, the consumable usage and the machine hours into the record.

  • Quick create, a full wizard, or straight from the phone
  • Roll-ups group one job across many blocks
  • Raise an issue into a follow-up task without leaving the row
Observations

Structured field records, not notes in a phone

A template defines what gets recorded; a run is one visit to one block; a spot is one reading inside it, with GPS, a timestamp, photos and optionally the row. Phenology, bud and shoot counts, disease scouting and lab sampling all run on the same machinery.

  • Build your own templates, or start from the system set
  • Save and next carries the context between spots
  • Counts roll up to a weighted block figure automatically
Health & safety

Three registers that actually connect

Risks are rated before and after controls. Actions are the controls that reduce them. Incidents record what happened, carry their WorkSafe notifiability, and hold the investigation. Everyone on site can report; manager and above investigate and close.

  • Inherent and residual risk matrices
  • WorkSafe notifiability flagged at the point of reporting
  • Staff sign-on, visitors and contractors in one on-site list
Assets & consumables

What you own, and what you are using up

Equipment carries hours, calibration specs, maintenance intervals and compliance dates. Consumables carry stock levels, application rates, withholding periods, ACVM registration and certification ticks - so the spray you reach for is the one your certification allows.

  • Sprayer calibration recorded as a pass or a fail, with the numbers
  • Stock drops as tasks are completed, and warns below minimum
  • Withholding periods travel with the product
Insights & reports

The season, measured

Twelve reports covering work done, block census, compliance and cost, with a property selector that moves between the whole company and a single site. Costs and pay rates are visible to admins only - a manager can approve hours without ever seeing a rate.

  • Hours per hectare and cost per hectare by block
  • Vineyard census with the certification breakdown
  • Export to PDF or spreadsheet for the auditor
Setup

Get your whole operation in without retyping it

Blocks, rows, equipment and consumables all share one import and export dialog. Export the register, edit it in a spreadsheet, upload it back - and see a diff of exactly what will change before anything is applied.

  • Draw blocks on the satellite map, or import from our database
  • Bulk-create rows, then paint variety and spacing across a range
  • Scope each person to the properties they should see
Who it is for

Everyone on the property, and only what they need

Five account types, enforced on the server rather than hidden in the interface. Your crew cannot see pay rates because the API will not send them.

Admin

Web + mobile

Owns the setup: people, properties, blocks, contractors, pay rates. The only tier that sees costs.

Manager

Web + mobile

Runs the work. Creates and assigns tasks, approves timesheets, closes incidents, reads every report.

Crew

Mobile only

Does the assigned work, captures observations, logs time. Sees what they are assigned, and nothing else.

Contractor

Mobile only

An outside business with its own account. Sees only the companies it holds a live relationship with.

Health & safety

Mobile only

Signs on and off, reports a hazard or an incident, signs a visitor in. Nothing commercial, by design.

Scope each person to the properties they should see. A manager on one site never sees another.

Compliance

The audit pack is already written

Organics, SWNZ and export market audits all ask the same question in different words: show me what you did, when, where, and who did it. Grow answers it from the record it kept while you worked.

Talk it through
  • Every spray recorded against the block, the product, the rate and the operator
  • SWNZ, Organic, Biodynamic and Regenerative certification held per block
  • WorkSafe notifiability decided at the moment an incident is reported
  • Staff sign-on, visitor register and contractor check-in as one evacuation headcount
  • Sprayer calibration records with the pass or fail and the measured output
  • Induction and site-access records against the person and the property
Climate intelligence

The part nobody else has

Grow sits on Auxein's own virtual climate network: interpolated surfaces built from council, Met station, and research station records going back to 1986, resolved to the property rather than the nearest town. That history drives the disease models, the growing degree day tracking and the phenology comparison.

  • Downy mildew, powdery mildew and botrytis pressure from your own conditions
  • Growing degree days and season tracking against forty years of your block
  • Modelled budburst and phenology beside what you actually observed
Check out Auxein Insights
In the field

Built for a phone in a wet pocket

The field app is not a shrunken dashboard. It is the three or four things someone needs while standing in the row, and it keeps working when the signal does not.

The day, before you start it

Observations, spot by spot

Incidents, from anyone on site

Works offline

Writes queue and sync when signal returns

Row by row

Status, notes and issues per row

Sign on to site

One tap, and the headcount is live

Download on the App StoreGet it on Google Play
Pricing

One price, by the hectare

No per-seat charge, no tier that hides the compliance features behind an upgrade. Your crew, your contractors and your health-and-safety accounts are all included.

$85 / ha / year

NZD, excluding GST. Minimums and multi-site rates on request.

  • Unlimited users, contractors and H&S accounts
  • Web and mobile apps, on iOS and Android
  • Climate history, disease models and all reports
  • Data import, onboarding and support included
  • If you want a new feature - we will build it
Book a walkthrough

Questions we get asked

See it against your own blocks

Send us a property and we will set it up with your blocks, your varieties and your climate history before the call - so you are looking at your vineyard, not a demo one.